Tuesday, January 15, 2008

Condo Things to Fix

Incorrectly installed box:

The stove is too far away from the wall becasue the gas pipes were installed in the wrong spot.
Dings on the door from movers...



Master Bathroom: Poor paint job.


Master bath: Poor installation of cabinets
Master Bath: Very poor installation (This needs to be replaced)

Hallway: These baseboards were damaged when they installed to replacement flooring.



Door to master bedroom: This needs to be redone, and replaced so it's NEW.

Hallway: The baseboards again...

Hallway: Scrap on the wall and black smears



Guest Bath: Black marks on floor molding, and blue marks.

Guest Bath: The day the water pressure was adjusted the toilet stopped functioning correctly.
Doorway to guest bed: More ding marks from the move out.


Kitchen: These need to be replaced. Not sure if it's water damage or a poor paint job.


Guest bath: Poor paint/caulking job

Main area: poor paint job on the ceiling. There was drywall replacements, and there is a huge set of lines where this replacement happend.

Kitchen: Scraps in the paint/drywall
When we moved in the door was dinged and the paint was all scrapped.

Kitchen Sink: When the sink was replaced (The previous sink was dinged and installed crooked) there was a residue left. I've spent over an hour trying to scrub it off with bleach and other cleaners to no avail.
Dining Room: Again the baseboards were damaged when they replaced the flooring.




Multiple scratches on the floor. (The blue tape keeps getting pulled up before it's replaced.) There is a dramatic difference between the flooring that is brand new, and the flooring that was in when it was used as the model.